At an airpark, the HOA is the airport operator.
An airpark association maintains a runway, answers for insurance, briefs guest pilots and plans seven-figure pavement projects, usually with a volunteer board. Generic HOA software was built for pools and parking. This page explains why that doesn’t fit.
- US airparks in 47 states
- 692US airparks in 47 states[LWYP]
- privately owned
- 92%privately owned[LWYP]
- private-use: no FAA NOTAMs, no Part 77 protection
- 71%private-use: no FAA NOTAMs, no Part 77 protection[LWYP]
- private-use fields owned by an owners’ association
- 315private-use fields owned by an owners’ association[NASR]
A neighborhood built on an airfield.
Homes and hangars line taxiway-streets that lead to a runway the association owns. Some owners fly every week, some never have, and some inherited a hangar. The same board has to keep the airfield safe, the pavement funded and every one of those owners informed.
- Current
- 1–30 days past due
- 31–60 days
- 90+ days · on a payment plan
Twelve problems generic HOA software doesn’t know exist.
Each one comes from airpark governing documents, FAA rules, state statutes or trade press. Each one maps to something Our Airpark does.
The runway is a capital cliff, and most boards can’t see it coming
Asphalt ages quietly. Cracks get sealed late or not at all, the pavement condition index slides a few points a year, and one spring the engineer says “mill and overlay.” The bill is often more than the association collects in a decade.
- Kelly Airpark rebuilt its 3,800-ft runway for about $900K, paid from dues saved since 1997, with no special assessment.[FLY-22]
- Cameron Park repaid a 2008 street loan of about $1.2M, with about $700K more in interest and fees, at $900 per parcel per year through 2029.[O61]
- The FAA says keeping pavement in good condition is 4–5x cheaper than rehabilitating fair or poor pavement.[AC-7B]
- The founder of the only airpark-focused management company told FLYING that many associations haven’t studied their repaving needs.[FLY-24]
- A 30-year reserve planner with runway, taxiway, lighting, PAPI, beacon, wind cone, weather station, fuel system, gate and culvert components
- PCI history per runway and a projected “overlay due” year
- Percent funded, a special-assessment risk gauge and what-if contributions
- A special-assessment planner that sizes the ask per lot class and links to the ballot
Illustrative — from the live demo
Special assessment of $6,000 per aviation lot, billed over 3 years, for the 2028 mill & overlay.
The board sees who voted, never how. Results are certified when the polls close.
Private-use fields have no official way to close the runway
When the mowers are out, the turf is soft, deer are on the runway or the lights are down, a public-use airport issues a NOTAM. Most airparks can’t. The warning goes out by email, a group text or a sign at the gate, and a returning pilot may never see it.
- A field status board with open, caution and closed states that expire on their own
- Only authorized airfield officers can post; every change is logged
- Alerts by text and email, a banner on the public Pilot Info page, and inclusion in every approved PPR briefing
- FAA-style NOTAM text drafted for public-use fields, with the filing path, and clear “advisory, not an FAA NOTAM” labeling
Dues that generic HOA software can’t model
Airpark covenants bill runway-access lots differently from street lots, charge per hangar door or per aircraft, keep the airport’s money in its own account, and collect one-time fees at transfer. Generic software assumes one flat assessment per home.
- Assessment schedules by lot class, per acre, per hangar door and per aircraft
- Operating, Airport and Runway Reserve funds with their own budgets
- One-time fees at transfer or certificate of occupancy
- Billing-run previews before anything posts
Insurance certificates live in someone’s inbox
Most airpark rules require every based aircraft to carry liability coverage, often with the association named as additional insured. Someone has to collect the certificates, check the endorsement and notice when they expire. Usually no one does.
- Meadow Creek Airpark requires $1M CSL on every based aircraft, the association as additional insured and a certificate filed every year.[MCA]
- Pegasus Airpark requires $5M of coverage from commercial operators.[PEG]
- Stand-alone certificate-tracking software charges about $0.95 per insured party per month.[BCS]
- Certificate tracking against your minimums, including the additional-insured check
- Automatic reminders at 60, 30 and 7 days, then escalation to the board
- A list of based aircraft with no certificate at all
- Association policy register and an insurer-ready report for renewal
Guest pilots arrive through web forms, PDFs and envelopes
Private-use airparks require prior permission to land. In practice that is a web form emailed to a volunteer, a PDF waiver, a scanned insurance page and a phone call, with cash in an envelope for the overnight fee.
- A public Pilot Info page and PPR form with an e-signed waiver and insurance attestation
- Approve or deny from a phone; an arrival briefing goes out automatically
- Resident hosts and annual guest caps per household
- Optional landing fees, with a recreational-use caution to review with counsel
Cars, carts, kids and airplanes share the same street
On a taxiway-street, a Bonanza, a golf cart, a teenager on an e-bike and the landscaper’s mower all have somewhere to be. Rules exist; knowing them, reporting near misses and enforcing them fairly is harder.
- In LWYP’s reader surveys, 49% of airparks reported bikes, carts or horses on the runway and 37% reported animals.[LWYP-S]
- LWYP tracks airparks where planes and cars share roads, including a fatal bicycle–airplane collision.[LWYP-J]
- Pegasus Airpark’s rules address minors on e-bikes, off-leash pets, speeding and unlit vehicles.[PEG]
- Safety reports with an anonymous option, triage and corrective actions
- Violations with a due-process ladder and fines posted to the ledger
- Speed limits and right-of-way rules published where residents read them
- Mandatory safety-meeting attendance tracking
A hangar home is a building, a hangar and a potential obstruction
The architectural committee has to check door widths and taxiway setbacks, and whether a new ridge line penetrates the airspace around the runway. Volunteers do it with a tape measure and a printout of the CC&Rs.
- Private-use airports are not covered by the FAA’s Part 77 notice requirements, so the association has to protect its own approaches.[77.9]
- Where Form 7460-1 applies, it is due at least 45 days before construction.[77.7]
- At Spruce Creek, a board vote against approach tree trimming was followed by loss of the night approach and a homeowner lawsuit.[7FL6-T]
- Meadow Creek requires a minimum hangar size and a $5,000 construction deposit.[MCA]
- Automatic checks for door size, taxiway-easement setback and wingspan clearance
- Height checked against the approach and transitional surfaces, with a 7460-1 flag and a plain-English explanation
- Deposits, conditions, committee votes and a completion inspection
- An obstruction register for trees in the approach, with trimming work orders
Pilots and non-pilots share one budget
Homes sell to non-pilots, heirs inherit hangars, and the share of owners who fly drifts down. The runway still needs an overlay. The argument about who pays for it can split a community.
- Separate aviation and community budget lines, so everyone sees what they fund
- Voting classes (all lots, aviation lots only) set per ballot
- A plain-English portal for non-pilot owners, and alerts they can opt out of
- Onboarding for new owners and heirs that explains the runway’s value
Home sales need aviation disclosures on a statutory clock
When a hangar home sells, the title company needs an estoppel or resale certificate, the governing documents, and disclosures about runway access, easements and insurance rules, often within ten business days and at a capped fee.
- Title companies order and pay online; the deadline clock starts automatically
- Packets with account status, governing documents and an airpark addendum: avigation easements, runway access, insurance rules, pending projects
- Approval and right-of-first-refusal tracking
- New-owner onboarding the day the deed records
The board changes. The runway doesn’t.
Volunteer boards turn over every year or two. The treasurer who knew the billing quirks moves away, the webmaster’s domain lapses, and the file on the last overlay is in a closet nobody can find.
- An account that belongs to the association, with as many admins as you need
- A versioned document vault and an audit log of every change
- A board handbook: capital project histories, vendor notes and a transition checklist
- White-glove onboarding and 90 days of concierge support
The fuel farm is a small environmental program
A self-serve 100LL tank is convenient and thin-margin, and it comes with daily quality checks, filter changes, inspections and an EPA spill plan. At an airpark, that’s a volunteer with a clipboard.
- Daily sump and filter-DP logs on a phone
- A failed check quarantines the tank and marks fuel unavailable on the status board
- Terminal sales import, delivery reconciliation and member billing
- SPCC checklist with the 5-year plan review on the compliance calendar
FAA and state paperwork slips quietly
An airpark has federal and state duties most boards learn about by accident: keeping FAA airport data current, filing notice before runway work, and renewing state registrations.
- The FAA asks private airport owners to confirm their data every three years to stay on aeronautical charts.[AOPA]
- In one FAA cleanup round, 154 unresponsive private airports were marked “Closed Indefinitely.”[RAF]
- Runway construction or alteration requires FAA notice at least 90 days ahead (Form 7480-1).[157.5]
- Florida associations with 100 or more parcels must keep records on a website or app.[FL-303]
- A compliance calendar keyed to your airport and state
- Completed items roll forward to their next due date automatically
- FAA 5010 data sheet with based-aircraft counts
- A public records section for statutory website requirements
How we know
Directory counts are our own count of the Living With Your Plane directory (Sep 26, 2026). FAA figures are our analysis of the NASR airport data cycle effective Oct 1, 2026. Survey figures from 2006–2008 are older and self-selected; treat them as direction, not precision. Examples from named airparks come from their own published documents.
Talk it through with usSources
- [LWYP]Living With Your Plane airpark directory · pulled Sep 26, 2026710 airparks listed worldwide, 692 in the US across 47 states; ownership, use and website fields counted by us.
- [NASR]FAA NASR 28-day airport data subscription · cycle effective Oct 1, 2026Our count of airports whose FAA-listed owner is an owners’ association, and of NOTAM service by facility.
- [AC-7B]FAA AC 150/5380-7B, Airport Pavement Management ProgramKeeping pavement in good condition is 4–5x less expensive than rehabilitating fair or poor pavement.
- [AC-28G]FAA AC 150/5200-28G, NOTAMs for Airport Operators
- [RDC]Realtor.com economic research on airpark listings (via Yahoo) · Dec 2024
- [FLY-22]FLYING: “Colorado Airpark Has an Eye Toward the Future” (Kelly Airpark) · Jul 2022
- [FLY-24]FLYING: “Airpark HOAs Aim to Keep Pace With Capital Improvements, Maintenance” · Sep 2024
- [O61]Cameron Park Airport District: property value impactAdvocacy page for a local funding measure; figures as stated by the district.
- [MCA]Meadow Creek Airpark Owner Book · Rev 1, 2021
- [PEG]Pegasus Airpark Operating and Safety Regulations · 2026
- [WA-FAQ]Wood Acres Airpark governing-documents FAQ
- [LWYP-S]LWYP reader surveys: problems at airparks · 2006–2008Older, self-selected surveys. Useful as direction, not as precise rates.
- [LWYP-J]LWYP: Joint use of roads and runways
- [77.9]14 CFR 77.9: construction requiring notice
- [77.7]14 CFR 77.7: form and time of notice (45 days)
- [157.5]14 CFR 157.5: notice of construction or alteration (90 days)
- [AOPA]AOPA: private airport charting and the 3-year data confirmation
- [RAF]Recreational Aviation Foundation: FAA renews effort to update private airport status
- [RUS]Recreational Aviation Foundation: 50-state recreational-use statute survey
- [112.1]40 CFR 112.1: SPCC applicability (over 1,320 gal aboveground)
- [AC-4C]FAA AC 150/5230-4C, Aircraft Fuel Storage, Handling and Dispensing
- [FL-303]Fla. Stat. 720.303: association records and website requirement
- [FL-851]Fla. Stat. 720.30851: estoppel certificates
- [TX-207]Tex. Prop. Code 207.003: resale certificates
- [7FL6]Spruce Creek POA airport procedures
- [7FL6-T]Homeowner-pilot sues fly-in HOA over approach trees (Spruce Creek) · 2016
- [SRUA]Stellar Runway Utilizers Association rules & fee classes · 2019
- [46U]Alpine Airpark CC&Rs (runway fee per hangar door)
- [MD50]Chesapeake Ranch Airport policy & procedures (separate airport fund)
- [AVweb]AVweb: FAA pilot population climbs again in 2025
- [BCS]BCS certificate-of-insurance tracking pricing · Sep 2026