The first 25 airparks lock in 30% off for life.
CWhy airparks

At an airpark, the HOA is the airport operator.

An airpark association maintains a runway, answers for insurance, briefs guest pilots and plans seven-figure pavement projects, usually with a volunteer board. Generic HOA software was built for pools and parking. This page explains why that doesn’t fit.

US airparks in 47 states
692
US airparks in 47 states[LWYP]
privately owned
92%
privately owned[LWYP]
private-use: no FAA NOTAMs, no Part 77 protection
71%
private-use: no FAA NOTAMs, no Part 77 protection[LWYP]
private-use fields owned by an owners’ association
315
private-use fields owned by an owners’ association[NASR]
1The shape of the problem

A neighborhood built on an airfield.

Homes and hangars line taxiway-streets that lead to a runway the association owns. Some owners fly every week, some never have, and some inherited a hangar. The same board has to keep the airfield safe, the pavement funded and every one of those owners informed.

1735ASKYLANE1234567891011121314BONANZA1516171819202122232425262728STINSON293031323334353637383940CUB LN41424344454647484950100LLUL94T-hangars 1–6MESA VIEW DR515253545556575859606162
  • Current
  • 1–30 days past due
  • 31–60 days
  • 90+ days · on a payment plan
Illustrative — from the live demo (Juniper Mesa) · dues status layer
P1Money

The runway is a capital cliff, and most boards can’t see it coming

Asphalt ages quietly. Cracks get sealed late or not at all, the pavement condition index slides a few points a year, and one spring the engineer says “mill and overlay.” The bill is often more than the association collects in a decade.

Evidence
  • Kelly Airpark rebuilt its 3,800-ft runway for about $900K, paid from dues saved since 1997, with no special assessment.[FLY-22]
  • Cameron Park repaid a 2008 street loan of about $1.2M, with about $700K more in interest and fees, at $900 per parcel per year through 2029.[O61]
  • The FAA says keeping pavement in good condition is 4–5x cheaper than rehabilitating fair or poor pavement.[AC-7B]
  • The founder of the only airpark-focused management company told FLYING that many associations haven’t studied their repaving needs.[FLY-24]
Cost of getting it wrong: Special assessments that split neighbors, bank loans with years of interest, or deferred maintenance that shortens pavement life further.
How Our Airpark handles it
  • A 30-year reserve planner with runway, taxiway, lighting, PAPI, beacon, wind cone, weather station, fuel system, gate and culvert components
  • PCI history per runway and a projected “overlay due” year
  • Percent funded, a special-assessment risk gauge and what-if contributions
  • A special-assessment planner that sizes the ask per lot class and links to the ballot
Dues, payments & runway reserves
Runway Reserve · 30-year plan
Reserve study 2026
Reserve balance
$412k
Runway Reserve
2028 runway overlay
$1.18M
today’s dollars
Reserve study % funded
22.5%
all components
Current contributions ($66.0k/yr) What-if: +$2,100 per aviation lot/yr + the special assessment
$2.50M$1.25M$0−$1.25M−$2.50M2026203620462055Off the chart: −$16.3M by 2055
Special-assessment risk
High

Illustrative — from the live demo

Ballot · Runway 17/35 rehabilitation
Open

Special assessment of $6,000 per aviation lot, billed over 3 years, for the 2028 mill & overlay.

Aviation lots only2/3 of votes cast50% quorum1 vote per lot
Turnout (29 of 50 lots)58%
Quorum met
Closes in
12 days
Per installment
$1,000
Receipts
29 sent

The board sees who voted, never how. Results are certified when the polls close.

P2Airfield

Private-use fields have no official way to close the runway

When the mowers are out, the turf is soft, deer are on the runway or the lights are down, a public-use airport issues a NOTAM. Most airparks can’t. The warning goes out by email, a group text or a sign at the gate, and a returning pilot may never see it.

Evidence
  • FAA NOTAM (D) distribution covers public-use airports listed in the Chart Supplement.[AC-28G]
  • None of the 315 private-use airports owned by an owners’ association has NOTAM (D) service in FAA data.[NASR]
Cost of getting it wrong: Landings on a closed or soft runway, strikes with equipment or wildlife, and liability for the association that knew.
How Our Airpark handles it
  • A field status board with open, caution and closed states that expire on their own
  • Only authorized airfield officers can post; every change is logged
  • Alerts by text and email, a banner on the public Pilot Info page, and inclusion in every approved PPR briefing
  • FAA-style NOTAM text drafted for public-use fields, with the filing path, and clear “advisory, not an FAA NOTAM” labeling
Airfield status & closures
P3Money

Dues that generic HOA software can’t model

Airpark covenants bill runway-access lots differently from street lots, charge per hangar door or per aircraft, keep the airport’s money in its own account, and collect one-time fees at transfer. Generic software assumes one flat assessment per home.

Evidence
  • Stellar Airpark’s runway association bills classes at 100%, 50% or 30% of a base rate.[SRUA]
  • Alpine Airpark charges a runway access fee per hangar door, on top of assessments.[46U]
  • Chesapeake Ranch keeps airport fees in a separate budget line and bank account.[MD50]
Cost of getting it wrong: Treasurers maintaining shadow spreadsheets, billing errors, and aviation and non-aviation owners each suspecting they subsidize the other.
How Our Airpark handles it
  • Assessment schedules by lot class, per acre, per hangar door and per aircraft
  • Operating, Airport and Runway Reserve funds with their own budgets
  • One-time fees at transfer or certificate of occupancy
  • Billing-run previews before anything posts
Dues, payments & runway reserves
P4Risk

Insurance certificates live in someone’s inbox

Most airpark rules require every based aircraft to carry liability coverage, often with the association named as additional insured. Someone has to collect the certificates, check the endorsement and notice when they expire. Usually no one does.

Evidence
  • Meadow Creek Airpark requires $1M CSL on every based aircraft, the association as additional insured and a certificate filed every year.[MCA]
  • Pegasus Airpark requires $5M of coverage from commercial operators.[PEG]
  • Stand-alone certificate-tracking software charges about $0.95 per insured party per month.[BCS]
Cost of getting it wrong: An accident involving an uninsured aircraft or an unendorsed policy can land on the association, and on its directors.
How Our Airpark handles it
  • Certificate tracking against your minimums, including the additional-insured check
  • Automatic reminders at 60, 30 and 7 days, then escalation to the board
  • A list of based aircraft with no certificate at all
  • Association policy register and an insurer-ready report for renewal
Insurance & compliance
P5Risk

Guest pilots arrive through web forms, PDFs and envelopes

Private-use airparks require prior permission to land. In practice that is a web form emailed to a volunteer, a PDF waiver, a scanned insurance page and a phone call, with cash in an envelope for the overnight fee.

Evidence
  • Spruce Creek requires prior permission to land.[7FL6]
  • Wood Acres Airpark caps each member at 12 guest aircraft a year.[WA-FAQ]
  • Recreational-use statutes vary by state; charging a fee can affect immunity in some of them.[RUS]
Cost of getting it wrong: Unbriefed pilots on an unfamiliar strip, lost waivers, and fees that may undercut the association’s legal protection.
How Our Airpark handles it
  • A public Pilot Info page and PPR form with an e-signed waiver and insurance attestation
  • Approve or deny from a phone; an arrival briefing goes out automatically
  • Resident hosts and annual guest caps per household
  • Optional landing fees, with a recreational-use caution to review with counsel
Guest pilots & Pilot Info page
P6Risk

Cars, carts, kids and airplanes share the same street

On a taxiway-street, a Bonanza, a golf cart, a teenager on an e-bike and the landscaper’s mower all have somewhere to be. Rules exist; knowing them, reporting near misses and enforcing them fairly is harder.

Evidence
  • In LWYP’s reader surveys, 49% of airparks reported bikes, carts or horses on the runway and 37% reported animals.[LWYP-S]
  • LWYP tracks airparks where planes and cars share roads, including a fatal bicycle–airplane collision.[LWYP-J]
  • Pegasus Airpark’s rules address minors on e-bikes, off-leash pets, speeding and unlit vehicles.[PEG]
Cost of getting it wrong: Collisions, incursions and the lawsuit that follows.
How Our Airpark handles it
  • Safety reports with an anonymous option, triage and corrective actions
  • Violations with a due-process ladder and fines posted to the ledger
  • Speed limits and right-of-way rules published where residents read them
  • Mandatory safety-meeting attendance tracking
Safety & emergency response
P7Risk

A hangar home is a building, a hangar and a potential obstruction

The architectural committee has to check door widths and taxiway setbacks, and whether a new ridge line penetrates the airspace around the runway. Volunteers do it with a tape measure and a printout of the CC&Rs.

Evidence
  • Private-use airports are not covered by the FAA’s Part 77 notice requirements, so the association has to protect its own approaches.[77.9]
  • Where Form 7460-1 applies, it is due at least 45 days before construction.[77.7]
  • At Spruce Creek, a board vote against approach tree trimming was followed by loss of the night approach and a homeowner lawsuit.[7FL6-T]
  • Meadow Creek requires a minimum hangar size and a $5,000 construction deposit.[MCA]
Cost of getting it wrong: Obstructions that shorten the usable runway, lost night operations and disputes that end in court.
How Our Airpark handles it
  • Automatic checks for door size, taxiway-easement setback and wingspan clearance
  • Height checked against the approach and transitional surfaces, with a 7460-1 flag and a plain-English explanation
  • Deposits, conditions, committee votes and a completion inspection
  • An obstruction register for trees in the approach, with trimming work orders
Votes, documents & architectural review
P8People

Pilots and non-pilots share one budget

Homes sell to non-pilots, heirs inherit hangars, and the share of owners who fly drifts down. The runway still needs an overlay. The argument about who pays for it can split a community.

Evidence
  • In a 2008 LWYP survey, 53% of airparks saw sales to non-aviators as an emerging issue.[LWYP-S]
  • US private pilots number about 174,000, less than half the 1980 peak.[AVweb]
  • Airpark homes list at about a 30% premium, which depends on the runway staying open.[RDC]
Cost of getting it wrong: Stalled votes, deferred maintenance and owners who stop paying runway assessments.
How Our Airpark handles it
  • Separate aviation and community budget lines, so everyone sees what they fund
  • Voting classes (all lots, aviation lots only) set per ballot
  • A plain-English portal for non-pilot owners, and alerts they can opt out of
  • Onboarding for new owners and heirs that explains the runway’s value
Votes, documents & architectural review
P9People

Home sales need aviation disclosures on a statutory clock

When a hangar home sells, the title company needs an estoppel or resale certificate, the governing documents, and disclosures about runway access, easements and insurance rules, often within ten business days and at a capped fee.

Evidence
  • Florida caps estoppel fees (a $250 base, adjusted for inflation), sets a 10-business-day deadline, and allows no fee at all if the certificate is late.[FL-851]
  • Texas caps resale certificate fees at $375.[TX-207]
  • Meadow Creek has a 30-day approval window with a right of first refusal.[MCA]
Cost of getting it wrong: Missed deadlines, forfeited fees, and buyers who close without understanding the runway covenant.
How Our Airpark handles it
  • Title companies order and pay online; the deadline clock starts automatically
  • Packets with account status, governing documents and an airpark addendum: avigation easements, runway access, insurance rules, pending projects
  • Approval and right-of-first-refusal tracking
  • New-owner onboarding the day the deed records
Directory, lots, aircraft & transfers
P10People

The board changes. The runway doesn’t.

Volunteer boards turn over every year or two. The treasurer who knew the billing quirks moves away, the webmaster’s domain lapses, and the file on the last overlay is in a closet nobody can find.

Evidence
  • In LWYP’s surveys, 61% of airparks reported poor meeting attendance and 51% had trouble collecting assessments.[LWYP-S]
  • Only 23% of US airparks list a website at all.[LWYP]
Cost of getting it wrong: Lost records, repeated mistakes and new boards that start from zero.
How Our Airpark handles it
  • An account that belongs to the association, with as many admins as you need
  • A versioned document vault and an audit log of every change
  • A board handbook: capital project histories, vendor notes and a transition checklist
  • White-glove onboarding and 90 days of concierge support
Votes, documents & architectural review
P11Airfield

The fuel farm is a small environmental program

A self-serve 100LL tank is convenient and thin-margin, and it comes with daily quality checks, filter changes, inspections and an EPA spill plan. At an airpark, that’s a volunteer with a clipboard.

Evidence
  • EPA’s SPCC rule applies once aboveground oil storage exceeds 1,320 gallons.[112.1]
  • FAA guidance calls for daily, monthly and annual fuel-quality checks and filter changes by differential pressure.[AC-4C]
Cost of getting it wrong: Contaminated fuel in someone’s engine, and environmental exposure for the association.
How Our Airpark handles it
  • Daily sump and filter-DP logs on a phone
  • A failed check quarantines the tank and marks fuel unavailable on the status board
  • Terminal sales import, delivery reconciliation and member billing
  • SPCC checklist with the 5-year plan review on the compliance calendar
Fuel farm
P12Airfield

FAA and state paperwork slips quietly

An airpark has federal and state duties most boards learn about by accident: keeping FAA airport data current, filing notice before runway work, and renewing state registrations.

Evidence
  • The FAA asks private airport owners to confirm their data every three years to stay on aeronautical charts.[AOPA]
  • In one FAA cleanup round, 154 unresponsive private airports were marked “Closed Indefinitely.”[RAF]
  • Runway construction or alteration requires FAA notice at least 90 days ahead (Form 7480-1).[157.5]
  • Florida associations with 100 or more parcels must keep records on a website or app.[FL-303]
Cost of getting it wrong: Falling off the charts, project delays and statutory penalties.
How Our Airpark handles it
  • A compliance calendar keyed to your airport and state
  • Completed items roll forward to their next due date automatically
  • FAA 5010 data sheet with based-aircraft counts
  • A public records section for statutory website requirements
Insurance & compliance

How we know

Directory counts are our own count of the Living With Your Plane directory (Sep 26, 2026). FAA figures are our analysis of the NASR airport data cycle effective Oct 1, 2026. Survey figures from 2006–2008 are older and self-selected; treat them as direction, not precision. Examples from named airparks come from their own published documents.

Talk it through with us

Sources

  1. [LWYP]Living With Your Plane airpark directory · pulled Sep 26, 2026710 airparks listed worldwide, 692 in the US across 47 states; ownership, use and website fields counted by us.
  2. [NASR]FAA NASR 28-day airport data subscription · cycle effective Oct 1, 2026Our count of airports whose FAA-listed owner is an owners’ association, and of NOTAM service by facility.
  3. [AC-7B]FAA AC 150/5380-7B, Airport Pavement Management ProgramKeeping pavement in good condition is 4–5x less expensive than rehabilitating fair or poor pavement.
  4. [AC-28G]FAA AC 150/5200-28G, NOTAMs for Airport Operators
  5. [RDC]Realtor.com economic research on airpark listings (via Yahoo) · Dec 2024
  6. [FLY-22]FLYING: “Colorado Airpark Has an Eye Toward the Future” (Kelly Airpark) · Jul 2022
  7. [FLY-24]FLYING: “Airpark HOAs Aim to Keep Pace With Capital Improvements, Maintenance” · Sep 2024
  8. [O61]Cameron Park Airport District: property value impactAdvocacy page for a local funding measure; figures as stated by the district.
  9. [MCA]Meadow Creek Airpark Owner Book · Rev 1, 2021
  10. [PEG]Pegasus Airpark Operating and Safety Regulations · 2026
  11. [WA-FAQ]Wood Acres Airpark governing-documents FAQ
  12. [LWYP-S]LWYP reader surveys: problems at airparks · 2006–2008Older, self-selected surveys. Useful as direction, not as precise rates.
  13. [LWYP-J]LWYP: Joint use of roads and runways
  14. [77.9]14 CFR 77.9: construction requiring notice
  15. [77.7]14 CFR 77.7: form and time of notice (45 days)
  16. [157.5]14 CFR 157.5: notice of construction or alteration (90 days)
  17. [AOPA]AOPA: private airport charting and the 3-year data confirmation
  18. [RAF]Recreational Aviation Foundation: FAA renews effort to update private airport status
  19. [RUS]Recreational Aviation Foundation: 50-state recreational-use statute survey
  20. [112.1]40 CFR 112.1: SPCC applicability (over 1,320 gal aboveground)
  21. [AC-4C]FAA AC 150/5230-4C, Aircraft Fuel Storage, Handling and Dispensing
  22. [FL-303]Fla. Stat. 720.303: association records and website requirement
  23. [FL-851]Fla. Stat. 720.30851: estoppel certificates
  24. [TX-207]Tex. Prop. Code 207.003: resale certificates
  25. [7FL6]Spruce Creek POA airport procedures
  26. [7FL6-T]Homeowner-pilot sues fly-in HOA over approach trees (Spruce Creek) · 2016
  27. [SRUA]Stellar Runway Utilizers Association rules & fee classes · 2019
  28. [46U]Alpine Airpark CC&Rs (runway fee per hangar door)
  29. [MD50]Chesapeake Ranch Airport policy & procedures (separate airport fund)
  30. [AVweb]AVweb: FAA pilot population climbs again in 2025
  31. [BCS]BCS certificate-of-insurance tracking pricing · Sep 2026
35Cleared to land

Built for the problems your board actually has.

Walk through the live demo as a board president, a treasurer, an airport manager or a homeowner. Or book 30 minutes and we’ll show it to you on your own runway.

Or claim your free Pilot Info page